Nammuldi Below Water Table Iron Ore Project, Stage 2

Location: Pilbara, Western Australia

Project Type: Mining Process Plant and Equipment

Crushing Services International/Rio Tinto

The scope of works include fabrication, surface treatment, modularisation and FOB steel structures. The steelwork packages consisted of structural steel, plateworks (transfer chutes, discharge chutes, hoppers etc). The steelworks were fabricated to meet Rio Tinto’s specifications and relevant Australian Standards.

Austruct were awarded the delivery of steelworks for the Nammuldi Project: Stage 2. Operating on learnings from Stage 1, the order for overseas materials was placed well in advance to allow for less pressured fabrication timelines and more time for inspection. During fabrication the client had only one in-country team member overseeing the project and there were no back charges to Austruct during the on-site installation. This highlights our reliability and quality-control processes as a fabricator. Not to mention the costs we save for our clients.